The Risk Control of Development Schedule in Information System Project Based on Dynamic Programming Algorithm

SHAN Xiao-hong, JIANG Guo-rui, HUANG Ti-yun ( Economics and Management School, Beijing University of Technology, Beijing 100022,China; School of Management, Harbin Institute of Technology, Harbin 150001,China)

Abstract: In this paper, we research on the risk control of development schedule in information system project by dynamic programming algorithm from the vision of integral information system. It provides the decision basis for how to cut the schedule risk of development of information system in every stage of the project. 
Conference Name:

第八届中国管理科学学术年会

Conference Time:

2006-10

Conference Place:

中国江苏南京

  • Series:

    (A) Mathematics/ Physics/ Mechanics/ Astronomy; (I) Electronic Technology & Information Science; (J) Economics & Management

  • Subject:

    Theory of Industrial Economy; Computer Software and Application of Computer; Mathematics; Macro-economic Management and Sustainable Development

  • Classification Code:

    F407.672;F224

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 117 Page: 581-584 Pagecount: 4 Size: 291k

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author