Knowledge Network Node

Optimization of mixed no-idle flexible flow scheduling in container terminalChinese Full TextEnglish Full Text (MT)

ZHONG Lingchong;LI Wenfeng;HE Lijun;ZHANG Yu;ZHOU Yong;School of Transportation and Logistics Engineering, Wuhan University of Technology;

Abstract: Quay crane, container truck and yard crane are important equipment in the container terminal. They have the characteristics of complex interaction between equipment, expensive operation cost and long idle time of quay crane. Considering the transferring process comprehensively, a bi-objective mathematical model for three-stage mixed no-idle flexible flow scheduling problem in multimodal container terminal was constructed aiming at minimizing the maximum completion time and total operating cost. ... More
  • DOI:

    10.13196/j.cims.2022.11.008

  • Series:

    (I) Electronic Technology & Information Science; (C) Architecture/ Energy/ Traffic/ Electromechanics, etc

  • Subject:

    Highway and Waterway Transportation; Automation Technology

  • Classification Code:

    TP18;U691.3

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 697 Page: 3421-3432 Pagecount: 12 Size: 801K

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author