Knowledge Network Node

Study on the dam-foundation dynamic interaction based on artificial boundary of perfectly matched layerChinese Full Text

PENG Gang;LIU Yun-long;CHEN Deng-hong;HOU Chun-ping;LIN Tian-cheng;LIU Yun-hui;Hubei Key Laboratory of Disaster Prevention and Mitigation, China Three Gorges University;College of Civil Engineering and Architecture, China Three Gorges University;

Abstract: Concrete dam-foundation dynamic interaction plays an important role in the earthquake response analysis and safety assessment of the high concrete dam. Based on perfectly matched layer(PML) theory, the wave equation and finite element equation of perfectly matched layer artificial boundary in time domain are deduced and implemented. The accuracy and stability of PML artificial boundary simulation of far-field radiation damping is verified through the problem of wave absorption under the transien... More
  • DOI:

    10.16285/j.rsm.2021.2196

  • Series:

    (C) Architecture/ Energy/ Traffic/ Electromechanics, etc

  • Subject:

    Hydraulic and Hydropower Engineering

  • Classification Code:

    TV312;TV64

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 484 Page: 3144-3152+3173 Pagecount: 10 Size: 1725K

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author