Knowledge Network Node

Research on fatigue simulation of stitch wire for high-speed railway catenaryChinese Full TextEnglish Full Text (MT)

LIU Jidong;CHEN Junqing;GUAN Jinfa;HAN Feng;WU Jiqin;School of Electrical Engineering, Southwest Jiaotong University;

Abstract: To study the service status and fatigue life of stitch wire, research was conducted on the stitch wire breaking in high-speed railway contact networks, and fatigue research was conducted. Based on the design parameters of the Wuhan-Guangzhou high speed railway, a dynamic simulation model of the pantograph and catenary was constructed to analyze the vibration state of the stitch wire at speed of 300 km/h. Due to the lifting effect of the pantograph on the contact suspension during operation, the ... More
  • DOI:

    10.13465/j.cnki.jvs.2024.12.002

  • Series:

    (C) Architecture/ Energy/ Traffic/ Electromechanics, etc

  • Subject:

    Railway Transportation

  • Classification Code:

    U225

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 244 Page: 9-16+29 Pagecount: 9 Size: 1421K

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author